TSLS PC Completed Projects

hello world!

Boundary Survey in Stroudsburg, PA

Scope: Performed a comprehensive boundary survey of a 400-acre property.
Services Provided: Installed monuments at all property corners, flagged property lines for clear identification, and prepared an official survey map for the client.
Schedule: Completed within six (6) weeks.

Topographical survey in Monticello, NY

Scope: Prepared a Digital Topographic Model (DTM) to support new septic and stormwater system design.
Services Provided: Collected data using LiDAR aerial mapping supplemented with traditional ground survey measurements.
Deliverables: Provided finalized plans in DWG and PDF formats.
Schedule: Completed within four (4) weeks.

Minor Subdivision in Monticello, NY

Scope: Subdivided a 75-acre property into two (2) parcels.
Services Provided: Represented the client at town meetings throughout the subdivision review process and filed the final subdivision map with the County.
Schedule: Completed within three (3) months.

Land Development in Stroudsburg, PA

Scope: Prepared a Boundary and Topographical Survey and site plan for a short-term rental expansion project.
Services Provided: Converted existing buildings into hotel-style rooms, proposed additional parking and driveway improvements, and designed a new septic system to support all rental units.
Schedule: Completed within four (4) weeks.

Construction Layout in Stroudsburg, PA

Scope: Staked out a trail within the State Park.
Services Provided: Set reference points at 20-foot intervals with cut and fill data. PennDOT standards for field and office practices were met throughout the project.
Schedule: Provided on-call support for the duration of the project.

Underground Utility Location in Vestal, NY

Scope: Located existing underground septic systems and drywells.
Services Provided: Utilized Ground Penetrating Radar (GPR) to locate utilities, measured their depth along with North and East coordinates.
Deliverables: Provided a DWG drawing with the location and elevation of the utilities.
Schedule: Completed within two (2) weeks.